Abstract
Predicting the breaking rate of impact hammers supports drilling planning in coal mines. Using 30 samples from the Koochakali North coal mine (Tabas, Iran; five lithologies), uniaxial compressive strength (UCS) and penetration depth were inputs and the instantaneous breaking rate (IBR) the output; IBR and depth were estimated from UCS using semi-empirical and analytical relations. A 2-1-1 artificial neural network (ANN) evaluated by repeated 5-fold cross-validation gave R² = 0.901 ± 0.011 and RMSE = 0.749 ± 0.042 m³/h, but linear (R² = 0.924) and quadratic (R² = 0.955) regression were more accurate, so the ANN showed no predictive advantage and served as a nonlinear model for analysis and optimization. Particle swarm optimization (PSO) then searched penetration depth on the model output with UCS fixed and an impact-energy cap. At a 4000 J cap (assuming constant blow frequency) the mean predicted IBR was 9.28 m³/h (mean predicted increase of 35% over the model prediction at current depth; 11–52% for caps of 2500–6000 J). These are model outputs; the two inputs are strongly correlated (r = −0.93), so their independent effects cannot be separated, and field validation is required.
Keywords
Subjects

[1]          ع. مجتهدزاده, ا. فرامرزی نژاد,  ا. محمدی. (1403). بررسی کاربرد و مدیریت ماشین آلات سنگین در پروژه های عمرانی. بیست و چهارمین کنفرانس ملی مهندسی عمران، معماری و شهرسازی,
[2]          Y. Zhao, A. Noorbakhsh, M. Koopialipoor, A. Azizi, and M. Tahir. (2020). A new methodology for optimization and prediction of rate of penetration during drilling operations. Engineering with Computers, 36(2), 587–595.
[3]          J. Kennedy and R. Eberhart. (1995). Particle swarm optimization. Proceedings of ICNN'95-international conference on neural networks, 4(1), 1942–1948.
[4]          S. Kahraman. (1999). Rotary and percussive drilling prediction using regression analysis. International journal of rock mechanics and mining sciences, 36(7), 981–989.
[5]          M. Iphar. (2012). ANN and ANFIS performance prediction models for hydraulic impact hammers. Tunnelling and Underground Space Technology, 27(1), 23–29.
[6]          S. Hojjati, D. Tumac, and S. Jeon. (2021). Accurate performance prediction model for impact hammer developed using customized evolutionary algorithm. Tunnelling and Underground Space Technology, 109(1), 103773.
[7]          J. Li et al. (2024). Theoretical and numerical analysis of the rock breaking process by impact hammer. Powder Technology, 448(1), 120254.
[8]          C. Zhang, Y. Zhao, K. Gao, Z. Liu, J. Qin, and X. Lv. (2025). Numerical simulation and experimental study on rock fragmentation and crack propagation characteristics with hole enlargement under impact load. Rock Mechanics and Rock Engineering, 58(3), 3015–3037.
[9]          M. Ismael, K. Abdelghafar, M. Sholqamy, and M. Elkarmoty. (2021). Performance prediction of hydraulic breakers in excavation of a rock mass. Rudarsko-geološko-naftni zbornik, 36(4), 69–80.
[10]        I. Ocak, S. E. Seker, and J. Rostami. (2018). Performance prediction of impact hammer using ensemble machine learning techniques. Tunnelling and underground space technology, 80(1), 269–276.
[11]        C. Aksoy. (2014). Proposed chart for the selection of impact hammer. International Journal of Rock Mechanics and Mining Sciences, 68(1), 120–127.
[12]        شرکت توسعه معادن فلات زرین کیمیا طبس. (1395). طرح اکتشاف معدن کوچکعلی طبس.
[13]        شرکت توسعه معادن فلات زرین کیمیا طبس. (1401). طرح بهره برداری معدن کوچکعلی طبس.
[14]        شرکت توسعه معادن فلات زرین کیمیا طبس. (1404). معدن کوچکعلی طبس.
[15]        ا. جعفری and ع. رهبرفرش بر. (1380). کاربرد چکش های هیدرولیکی در حفاری تونل وبررسی پارامترهای مؤثر بر انتخاب آن. پنجمین کنفرانس تونل ایران,
[16]        آ. م. م. روانشادنیا.(1392) مدیریت ماشین‌آلات عمرانی برای مهندسان و مدیران پروژه (no. 1100). سیمای دانش، آذر, 1392, p. 362.
[17]        E. Ebrahimi, M. Monjezi, M. R. Khalesi, and D. J. Armaghani. (2016). Prediction and optimization of back-break and rock fragmentation using an artificial neural network and a bee colony algorithm. Bulletin of Engineering Geology and the Environment, 75(1), 27–36.
[18]        B. Vergara, M. Torres, V. Aramburu, and C. Raymundo. (2021). Predictive model of rock fragmentation using the neuro-fuzzy inference system (ANFIS) and Particle swarm optimization (PSO) to estimate fragmentation size in open pit mining. International Conference on Applied Human Factors and Ergonomics, 124–131.