1. Hassanpour, J. and J. Rostami. Predicting TBM performance in second lot of karaj water conveyance tunnel (KWCT). in ISRM EUROCK. 2009. ISRM.
2. Hassanpour, J., et al., TBM performance analysis in pyroclastic rocks: a case history of Karaj water conveyance tunnel. Rock mechanics and rock engineering, 2010. 43: p. 427-445.
3. Hassanpour, J., J. Rostami, and J. Zhao, A new hard rock TBM performance prediction model for project planning. Tunnelling and Underground Space Technology, 2011. 26(5): p. 595-603.
4. Goodarzi, S., et al., Predicting TBM performance in soft sedimentary rocks, case study of Zagros mountains water tunnel projects. Tunnelling and Underground Space Technology, 2021. 109: p. 103705.
5. Pourhashemi, S.M., et al., TBM performance analysis in very strong and massive rocks; case study: Kerman water conveyance tunnel project, Iran. Geomechanics and Geoengineering, 2022. 17(4): p. 1110-1122.
6. Hassanpour, J., et al., Investigating the relationships between rock mass classification systems based on data from mechanized tunneling projects in Iran. Bulletin of Engineering Geology and the Environment, 2022. 81(4): p. 147.
7. Alp, M. and A. Apaydin, Assessment of the factors affecting the advance rate of the Tunnel Gerede, the longest and one of the most problematic water transmission tunnels of Turkey. Tunnelling and Underground Space Technology, 2019. 89: p. 157-169.
8. Bilgin, N. and M. Algan, The performance of a TBM in a squeezing ground at Uluabat, Turkey. Tunnelling and Underground Space Technology, 2012. 32: p. 58-65.
9. Dalgıç, S., Tunneling in fault zones, Tuzla tunnel, Turkey. Tunnelling and Underground Space Technology, 2003. 18(5): p. 453-465.
10. Diwakar, K., et al., Challenges in tunneling in the Himalayas: A survey of several prominent excavation projects in the Himalayan Mountain Range of South Asia. Geotechnics, 2022. 2(4): p. 802-824.
11. Goel, R., Experiences and lessons from the use of TBM in the Himalaya–A review. Tunnelling and Underground Space Technology, 2016. 57: p. 277-283.
12. Paltrinieri, E., Analysis of TBM tunnelling performance in faulted and highly fractured rocks. 2015, EPFL.
13. Paltrinieri, E., et al., Probabilistic simulations of TBM tunnelling in highly fractured and faulted rocks. Tunnelling and Underground Space Technology, 2016a. 57: p. 183-194.
14. Paltrinieri, E., F. Sandrone, and J. Zhao, Analysis and estimation of gripper TBM performances in highly fractured and faulted rocks. Tunnelling and Underground Space Technology, 2016b. 52: p. 44-61.
15. Panthi, K. Appropriateness of open TBM tunnelling in the Himalaya–A case study. in ISRM EUROCK. 2009. ISRM.
16. Taherian, A., TBM tunneling hazards identification and mitigation methods through subterranean rivers: an evaluation of nowsud tunnel in the Iran. Geotechnical and Geological Engineering, 2023. 41(2): p. 1673-1687.
17. Shayan, F., A. Uromeie, and J. Hassanpour, Classification of fault zones in mechanized tunneling projects, in Expanding Underground-Knowledge and Passion to Make a Positive Impact on the World. 2023, CRC Press. p. 2245-2252.
18. Shayan, F., A. Uromeihy, and J. Hassanpour, Classification framework for engineering geological challenges in fault zones during TBM tunneling: Insights from mechanized projects in Iran. Engineering Geology, 2025. 358: p. 108382.
19. Barton, N., TBM tunnelling in jointed and fractured rock. AA Balkema, Rotterdam, Netherlands, 2000.
20. Klein, S., M. Schmoll, and T. Avery. TBM performance at four hard rock tunnels in California. in Proceedings of the rapid excavation and tunneling conference. 1995. SOCIETY FOR MINING, METALLOGY & EXPLORATION, INC.