Document Type : ٍAn English Original Article
|
[1]
|
C. L. Pritchard and P. R. PMP, Risk management: concepts and guidance, Boca Raton: CRC Press, 2014.
|
|
[2]
|
P. M. Institute, A Guide to the Project Management Body of Knowledge (PMBOK® Guide)–Seventh Edition and The Standard for Project Management, Pennsylvania: Project Management Institute, 2021.
|
|
[3]
|
J. Reilly and J. Brown, "Management and control of cost and risk for tunneling and infrastructure projects," Tunnelling and Underground Space Technology, vol. 19, no. 4, p. 330, 2004.
|
|
[4]
|
S. D. Eskesen, P. Tengborg, J. Kampmann and T. H. Veicherts, "Guidelines for tunnelling risk management," international tunnelling association, working group No. 2. Tunnelling and underground space technology, vol. 19, no. 3, pp. 217-237, 2004.
|
|
[5]
|
J. H. Klein and R. B. Cork, "An approach to technical risk assessment," International Journal of Project Management, vol. 16, no. 6, pp. 345-351, 1998.
|
|
[6]
|
M. Salehi and R. Tavakkoli-Moghaddam, "Project selection by using a fuzzy TOPSIS technique," World Academy of Science, Engineering and Technology, vol. 40, pp. 85-90, 2008.
|
|
[7]
|
J. Emblemsvåg and L. Endre Kjølstad, "Strategic risk analysis–a field version," Management decision, vol. 40, no. 9, pp. 842-852, 2002.
|
|
[8]
|
S. Ghosh and J. Jintanapakanont, "Identifying and assessing the critical risk factors in an underground rail project in Thailand: a factor analysis approach," International journal of project management, vol. 22, no. 8, pp. 633-643, 2004.
|
|
[9]
|
J. Reilly and H. Parker, "Benefits and life-cycle costs of underground projects," in AITES-ITA World Tunnel Congress, Prague, 2007.
|
|
[10]
|
M. Monjezi, H. Dehghani, T. N. Singh, A. R. Sayadi and A. Gholinejad, "Application of TOPSIS method for selecting the most appropriate blast design," Arabian journal of geosciences, vol. 5, no. 1, pp. 95-101, 2012.
|
|
[11]
|
M. Mirzehi, M. Rezakhah, A. Mousavi and Z. Nabavi, "New MIP model for short-term planning in open-pit mines considering loading machine performance: a case study in Iran," International Journal of Mining and Mineral Engineering, pp. 341-364, 2023.
|
|
[12]
|
E. Moreno, F. Ferreira, M. Goycoolea, D. Espinoza, A. Newman and M. Rezakhah, "Linear programming approximations for modeling instant-mixing stockpiles," Application of computers and operations research in the mineral industry-proceedings of the 37th international symposium, APCOM, vol. 2009, pp. 582-587, 2015.
|
|
[13]
|
M. Rezakhah and E. Moreno, "Open pit mine scheduling model considering blending and stockpiling," in Proceedings of the 28th International Symposium on Mine Planning and Equipment Selection - MPES 2019, Perth, 2019.
|
|
[14]
|
M. Monjezi, K. Goshtasbi, M. Rezakhah and T. N. Singh, "Design of stable slopes for Songun copper mine," Mining Technology, vol. 116, no. 3, pp. 146-152, 2007.
|
|
[15]
|
M. Rezakhah, "Short-Term Production Planning Optimization in Open-Pit Copper Mines A MILP Model Integrating Comminution Modeling and Feed Quality Control," Journal of Mining and Environment, 2025.
|
|
[16]
|
S. Khajevand, Rezakhah, M. M. M. and F. A. Manríquez León, "Enhancing Transportation Fleet Efficiency in Open-Pit Mining via Simulation: a Case Study," Journal of Mining and Environment, vol. 16, no. 3, pp. 997-1007, 2025.
|
|
[17]
|
S. Tajik, M. Monjezi, M. Rezakhah and M. Amiri Hosseini, "Development of a Mathematical Model for Predicting Blast-Induced Fragmentation Considering Elastic Wave Velocities," JOURNAL OF ROCK MECHANICS, vol. 7, no. 2, pp. 71-82, 2023.
|
|
[18]
|
N. Allen and D. Ocenosak, "Analyzing Risk and Cost to Society of Tunnel Alternatives," in NASTT No-Dig Conference, Dallas, Texas, 2008.
|
|
[19]
|
C. T. Chen, "Extensions of the TOPSIS for group decision-making under fuzzy environment," Fuzzy sets and systems, vol. 114, no. 1, pp. 1-9, 2000.
|
|
[20]
|
G. R. Jahanshahloo, F. H. Lotfi and M. Izadikhah, "Extension of the TOPSIS method for decision-making problems with fuzzy data," Applied mathematics and computation, vol. 181, no. 2, pp. 1544-1551, 2006.
|
|
[21]
|
A. H. Bangian, M. Ataei, A. Sayadi and A. Gholinejad, "The application of fuzzy MADM modeling to define optimum post mining land use for pit area to recognize reclamation costs in open pit mining," Archives of Mining Sciences, vol. 56, no. 1, pp. 93-118, 2011.
|
|
[22]
|
A. N. Beard, "Tunnel safety, risk assessment and decision-making," Tunnelling and Underground Space Technology, vol. 25, no. 1, pp. 91-94, 2010.
|
|
[23]
|
S. Cheng, C. W. Chan and G. H. Huang, "An integrated multi-criteria decision analysis and inexact mixed integer linear programming approach for solid waste management," Engineering Applications of Artificial Intelligence, vol. 16, no. 5-6, pp. 543-554, 2003.
|
|
[24]
|
M. Monjezi, S. Moezinia, J. K. Hamidi, M. Rezakhah, V. Amini and A. Batarbiat, "Determining the Appropriate Rehabilitation Method in Open-Pit Mines using Decision-Making Methods," Journal of Mining and Environment, 2025.
|
|
[25]
|
T. Isaksson and H. Stille, "Model for estimation of time and cost for tunnel projects based on risk evaluation," Rock mechanics and rock engineering, vol. 38, no. 5, pp. 373-398, 2005.
|
|
[26]
|
M. Van Staveren, "International state of the art report on integration of geotechnical risk management and project risk management," ISSMGE TC304-Task Force 3, Country Report on Integrating Geotechnical Risk Management in Project Risk Management, 2013.
|
|
[27]
|
A. Kauffman and M. M. Gupta, Introduction to fuzzy arithmetic: theory and application, 1991.
|
|
[28]
|
J. Lu and D. M.-o. g. d. m. m. s. a. a. w. f. s. t. (. 6. I. C. P. Ruan, Multi-objective group decision making: methods, software and applications with fuzzy set techniques (Vol. 6), Imperial College Press, 2007.
|
|
[29]
|
C. Parkan and M. L. Wu, "On the equivalence of operational performance measurement and multiple attribute decision making," International Journal of Production Research, vol. 35, no. 11, pp. 2963-2988, 1997.
|
|
[30]
|
Y. Y. (. Haimes, Risk modeling, assessment, and management, John Wiley & Sons, 2011.
|
|
[31]
|
L. Xu and G. Liu, "The study of a method of regional environmental risk assessment," Journal of Environmental Management, vol. 90, no. 11, pp. 3290-3296, 2009.
|
|
[32]
|
M. A. Abo-Sinna and A. H. Amer, "Extensions of TOPSIS for multi-objective large-scale nonlinear programming problems," Applied mathematics and computation, vol. 162, no. 1, pp. 243-256, 2005.
|
|
[33]
|
H. Wagner, "Risk evaluation and control in underground construction," In International Symposium on Underground Excavation and Tunneling, pp. 2-4, February 2006.
|
|
[34]
|
M. A. Sánchez, A. Foyo, C. Tomillo and E. Iriarte, "Geological risk assessment of the area surrounding Altamira Cave: A proposed Natural Risk Index and Safety Factor for protection of prehistoric caves," Engineering Geology, vol. 94, no. 3-4, pp. 180-200, 2007.
|
|
[35]
|
L. A. Zadeh, "Fuzzy sets," Information and control, vol. 8, no. 3, pp. 338-353, 1965.
|
|
[36]
|
H. J. Zimmermann, Fuzzy set theory—and its applications, Springer Science & Business Media, 2011.
|
|
[37]
|
A. Sayadi, M. Hayati and M. Hosseinpoor, "The analysis and application risk identification in tunneling projects," in 5th Int. Project Management Conference, Tehran, Iran, 2009.
|
|
[38]
|
J. Lu and D. Ruan, Multi-objective group decision making: methods, software and applications with fuzzy set techniques (Vol. 6), Imperial College Press, 2007.
|
|
[39]
|
S. D. Eskesen, P. Tengborg, J. Kampmann and T. H. Veicherts, "Guidelines for tunnelling risk management: international tunnelling association, working group No. 2," Tunnelling and underground space technology, vol. 19, no. 3, pp. 217-237, 2004.
|