Abstract
The use of full-section mechanized tunnel boring machines under various geological conditions for the purpose of excavating long tunnels has expanded greatly in recent years. Selecting the appropriate full-section tunnel boring machine is one of the important and decisive steps in advancing the excavation process. In this regard, the most appropriate machine can be selected based on the characteristics of the excavation environment and the tunnel boring machine. In the first step of this research, criteria such as: RQD index, compressive strength, tensile strength, instability of the abutment, instability of the walls, spacing of discontinuities, water intrusion, fault zones, dissolution cavities, tunnel diameter, tunnel slope, and radius of curvature of the route in the second section of the Imamzadeh Hashem (AS) tunnel were evaluated, and in the next step, the most appropriate mechanized tunnel boring machine was examined and selected from among the four proposed machines. Thus, using the Fuzzy-TOPSIS method and taking into account the opinions of experts, the most suitable mechanized tunnel boring machine was selected for the excavation of the second section of the Imamzadeh Hashem (AS) Tunnel. The results of the study showed that, according to the aforementioned criteria, the Double Shield Universal TBM tunnel boring machine is the most suitable option for the excavation of the second section of the Imamzadeh Hashem (AS) Tunnel.
Barla, G., & Pelizza, S. (2000). TBM tunnelling in difficult ground conditions. geoeng melbourne Australia.
Bejari, H., shahriar, k., khademi hamidi, j., & Akbarpour Shirazi, M. (2010). Optimal Tunneling method selection using Fuzzy multiple Attribute decision making method. ISRM International symposium.
Fahimdanesh, S., & Hafezi Moghadas, N. (2014). Tunneling machine selection model based on geologic parameters using AHP method. Indian Journal of Scientific Research, 137-145.
Fouladgar , M. M., Yazdani Chamzini, A., & Zavadskas, E. K. (2012). Risk evaluation of tunneling projects. Archives of Civil and Mechanical Engineering, 1-12.
Jafari Rad, A. R., & Bucsh, W. (2011). Porphyry Copper Mineral Prospectivity Mapping Using Interval Valued Fuzzy Sets Topsis Method in Central Iran. Journal of Geographic Information System, 312-317.
Karami, M., Faramarzi, L., & Raisi Gahrooee, D. (2014). The influence of geological features abd geomechanical properties of rock mass on TBM selection for SABZKOUH water conveyance tunnel. Journal of engineering geology, 2169-2198.
Khademi Hamidi, J., Shahriar, K., Rezai, B., Rostami, J., & Bejari, H. (2010). Risk assessment based selection of rock TBM for adverse geological conditions using Fuzzy-AHP. Bullten of engineering geology and the environment, 523-532.
Lashgari, A., Yazdani Chamzini, A., Fouladgar, M. M., Zavadskas, E. K., shafiee, S., & Abbate, N. (2012). Equipment selection using Fuzzy multi criteria decision making model: case study of Gole Gohar Iron Mine. Inzinerine Ekonomika- Engineering Economics, 125-136.
Mikaeil, R., Zare Naghadehi, M., & Khalokakaie, R. (2009). A decision support system using fuzzy analytical hierarchy process (FAHP) and TOPSIS approaches for selecting of the optimum underground mining method. Archives of mining science, 349-368.
Pazand, K., & Hezarkhani, A. (2014). Porphyry Cu potential area selection using the combine AHP-TOPSIS methods, a case study in siahrud area (NW, IRAN). Earth Science Informations, 207-220.
Safari, M., Kakaei, R., Ataei, M., & Karazmoozian, M. (2012). Using Fuzzy-TOPSIS method for material processing plant site selection. Arabian journal of Geosciences, 1011-1019.
Shahriar, K., Sharifzadeh, M., & Khademi Hamidi, J. (2008). Geotechnical risk assessment based approach for rock TBM selection in difficult ground conditions. Tunnelling and Underground Space Technology, 318-325.
Shiyoung, W., Wang, G., jinsong, X., & Jian, W. (2008). Research on TBM Type-selection and key construction technology for Jippeng 2 hydropower station. Chinese Journal of Rock Mechanics and Engineering, 15.
Weibing, L., & Bin, L. (2009). Analyses of the Geological factors effecting on selecting type of TBM. Chinese Journal of Rock Mechanics and Engineering.
Xinmin, W., Jianchun, Q., Qilini, Z., Wujiu, C., & Xianlong, C. (2013). Mining method optimization of Gu mountain stay ore based on AHP-TOPSIS evaluation model. Journal of Central south University (science and Technology).
Yari, M., Monjezi, M., & Bagherpour, R. (2014). Selecting the most suitable blasting pattern using AHP-TOPSIS method: sungun copper mine. Mineral Mining Technology, 967-975.
Yazdani Chamzini, A., & Haji Yakhchali, S. (2012). Tunnel Boring Machine (TBM) selection using fuzzy multicriteria decision making method. Tunnelling and Underground Space Technology, 194-204.
Yazdani, A., Lashgari, A., & Basiri, M. H. (2010). Choosing shaft sinking method by using the combination of Fuzzy AHP &Fuzzy TOPSIS approaches. 1st International applied geological congress, Islamic Azad University. tehran.
ساحل, م. م. (1382). خدمات مهندسی طرح و ساخت تونل قطعه دوم امامزاده هاشم (ع). تهران.
کوروش , ش., شریف زاده, م., خادمی حمیدی, ج., حدادی, م. (1385). انتخاب ماشین تونلزنی تمام مقطع در سنگ بر اساس کاهش مخاطرات ژئوتکنیکی. هفتمین کنفرانس تونلسازی تهران-ایران, (ص. 1059-1070). تهران.
عطایی, م. (۱۳۸۹). تصمیم گیری چند معیاره فازی. (ک. محمد, تدوین) شاهرود: انتشارات دانشگاه صنعتی شاهرود.
Mikaeil,R. , Jafar Shirzad,P. and Khademi Hamidi,J. (2017). Selecting the Appropriate Tunnel Boring Machine (TBM) Using Fuzzy-TOPSIS Technique Case Study: Emam Zadeh Hashem Tunnel. JOURNAL OF ROCK MECHANICS, 1(2), 29-40.
MLA
Mikaeil,R. , , Jafar Shirzad,P. , and Khademi Hamidi,J. . "Selecting the Appropriate Tunnel Boring Machine (TBM) Using Fuzzy-TOPSIS Technique Case Study: Emam Zadeh Hashem Tunnel", JOURNAL OF ROCK MECHANICS, 1, 2, 2017, 29-40.
HARVARD
Mikaeil R., Jafar Shirzad P., Khademi Hamidi J. (2017). 'Selecting the Appropriate Tunnel Boring Machine (TBM) Using Fuzzy-TOPSIS Technique Case Study: Emam Zadeh Hashem Tunnel', JOURNAL OF ROCK MECHANICS, 1(2), pp. 29-40.
CHICAGO
R. Mikaeil, P. Jafar Shirzad and J. Khademi Hamidi, "Selecting the Appropriate Tunnel Boring Machine (TBM) Using Fuzzy-TOPSIS Technique Case Study: Emam Zadeh Hashem Tunnel," JOURNAL OF ROCK MECHANICS, 1 2 (2017): 29-40,
VANCOUVER
Mikaeil R., Jafar Shirzad P., Khademi Hamidi J. Selecting the Appropriate Tunnel Boring Machine (TBM) Using Fuzzy-TOPSIS Technique Case Study: Emam Zadeh Hashem Tunnel. JOURNAL OF ROCK MECHANICS, 2017; 1(2): 29-40.